Thursday, April 29th, 2010
- Locate and cement DOOR HINGES to GARAGE DOOR.
- Locate and cement HINGE SOCKETS to sides at GARAGE DOOR OPENING.
- Allow cemented DOOR HINGES and HINGE SOCKETS to dry for about five (5) minutes and then assemble DOOR to OPENING by inserting HINGES into HINGE SOCKETS.
- Locate and cement LEFT END WALL to LEFT SIDE of LOWER FRONT WALL.
- Locate and cement, from the inside, (2) PICTURE WINDOWS to FRONT WALL.
- Locate and cement LEFT END WALL to LEFT SIDE of LOWER FRONT WALL.
- Locate and cement GARAGE INSIDE WALL to RIB on inside of FRONT WALL between WINDOW and GARAGE DOOR.
- Locate and cement REAR WALL to LEFT END WALL and to GARAGE INSIDE WALL.
- Locate and cement GARAGE END WALL to FRONT and REAR WALL.
- Locate and cement UPPER FRONT WALL to SIDE WALLS.
- Locate and cement SUN DECK over GARAGE END of HOUSE.
- Locate and cement CHIMNEY to LEFT END WALL.
- Locate and cement CHIMNEY SMALL SECTION to UPPER PART of CHIMNEY.
- Locate and cement CHIMNEY CAP to CHIMNEY.
- Locate and cement ROOF to HOUSE.
- Locate and cement SUN DECK RAILING (3 Sections) to SUN DECK.
- Locate and cement (2) TRELLISES to GARAGE END WALL.
- Locate and cement (12) WIDE SHUTTERS to sides of FRONT and REAR SECOND STORY WINDOWS.
- Locate and cement (10) NARROW SHUTTERS to sides of WINDOWS in END WALLS.
- Locate and cement (2) DOOR CANOPIES over BACK DOORS.
- Locate and cement (2) FRONT DOOR LIGHTS alongside FRONT DOOR.
- Locate and cement RAIN GUTTERS to underside of ROOF OVERHANG.
- Locate and cement DOWN SPOUTS to GUTTERS and WALLS.
- Locate and cement FRONT DOOR STEP to FRONT WALL.
- Locate and cement BACK DOOR STEP and PATIO to BACK WALL.
Tags: 652, assembly, aurora, chimney, colonial, garage, HO, house, instructions, shutters, sun deck, trellises
Posted in Aurora Model Motoring HO Slot Car Racing | No Comments »