Posts Tagged ‘station’

Aurora HO Model 658-149 Gas Station Assembly Instructions

Wednesday, May 5th, 2010
  1. Read DIRECTIONS on back of DECALS and apply as follows:
    1. Tires, Tools and Accessories Decal to inside of Rear Wall of SERVICE STATION BUILDING.
    2. MODEL MOTORING SERVICE STATION” DECAL to HIGHWAY SIGNBOARD.
    3. AURORA SERVICE STATION” DECALS to SIGN POSTS.
    4. MODEL MOTORING SERVICE CENTER” DECAL to ROOF SIGN. Set aside to dry.
  2. Cement clear plastic DOOR HANGERS to rear of each LARGE DOOR. Set aside to dry.
  3. Cement DOOR HANGER BRACES to inside of FRONT WALL PANEL.
  4. Cement SMALL DOOR in position to FRONT WALL PANEL. Set FRONT WALL PANEL aside to dry.
  5. Cement HYDRAULIC JACK HANDLE to JACK BASE. Set aside to dry.
  6. Cement GAS SIGN LEGS to GAS SIGN. Set aside to dry.
  7. Cement GASOLINE PUMP HALVES together, #1 to #1, #2 to #2, etc, with GAUGE PANEL between HALVES. Cement PUMP HOSE NOZZLE to PUMPS. Set aside to dry.
  8. Cement ISLAND SIGN to ISLAND together with ISLAND SIGN BASE HALVES.
  9. Cement OIL SHELF PANELS to SIGN BASE.
  10. Cement GASOLINE PUMPS to ISLAND.
  11. Cement SHORT and INTERMEDIATE SPOTLIGHTS to ISLAND SIGN and set aside to dry.
  12. Cement TIRE RACK SHELVES between RACK ENDS. Cement TIRES on RACK and set aside to dry.
  13. Cement FRONT and BACK of AIR PUMP to AIR PUMP BASE with AIR GAUGE cemented to TOP. Set aside to dry.
  14. Cement INDICATOR to FRONT PANEL of “COKE” MACHINE.
  15. Cement FRONT and REAR PANELS of “COKE” MACHINE together and cement TOP to MACHINE.
  16. Cement “COKE” MACHINE to MACHINE BASE.
  17. Cement HIGHWAY SIGN to SIGN BASE and 4 LONG SPOTLIGHTS to top of HIGHWAY SIGN. Set aside to dry.
  18. Cement CASH REGISTER to COUNTER TOP and TOP to COUNTER BASE. Set aside to dry.
  19. Cement TELEPHONE to corner of BOOTH BASE as shown. Cement BOOTH UPPER HALF to BASE. Cement BOOTH DOOR into PLACE. Set aside to dry.
  20. Cement PUSH BAR to SMALL DOOR in FRONT WALL.
  21. Snap clear plastic DOOR HANGERS into HOLES in ends of DOOR HANGER BRACES on FRONT WALL PANEL.
  22. Cement 2 END PANELS and BACK WALL and FRONT WALL PANELS together.
  23. Cement WALL PANELS to STATION FLOOR. Allow to dry.
  24. Cement COUNTER to STATION FLOOR.
  25. Cement FRONT and SIDE GLASS STORE PANELS to FRONT WALL and RIGHT END WALL PANELS.
  26. Cement MARQUEE into position. Be sure GLASS PANELS enter groove in bottom of MARQUEE.
  27. Cement STATION ROOF to SIDE WALL PANELS. Set aside to dry.
  28. Cement ROOF SIGN to STATION ROOF.

Aurora HO Model 656-129 Railroad Station Assembly Instructions

Monday, May 3rd, 2010

A. Assembly Of Station Building

  1. Locate and cement, from the inside, WINDOWS and DOORS to openings in WALLS.
  2. Cement END WALLS to FRONT WALL. NOTE: END WALLS are interchangeable so that END WALL with FREIGHT DOOR may be placed either on the LEFT or the RIGHT.
  3. Cement REAR WALL to END WALLS.
  4. Locate and cement WALL ASSEMBLY to BASE WALK.
  5. Locate and cement FRONT ROOF and REAR ROOF to WALLS.
  6. Locate and cement FRONT GABLE ROOF HALVES to FRONT GABLE.
  7. Locate and cement REAR GABLE ROOF HALVES to REAR GABLES.
  8. Locate and cement ROOF EXTENSION SUPPORTS to CORNERS of WALLS.
  9. Locate and cement FRONT and REAR ROOF EXTENSIONS to FRONT and REAR WALLS.
  10. Cement SIDE ROOF EXTENSIONS to SIDE WALLS.
  11. Locate and cement RAIN GUTTERS to ROOF EXTENSIONS.
  12. Locate and cement (2) DOWN SPOUTS to GUTTERS and WALLS.
  13. Cement (2) LIGHT FIXTURES at TOP of DOORWAYS.
  14. Cement (2) STATION SIGN BOARDS to underside of SIDE ROOF EXTENSIONS.
  15. Cement CHIMNEY HALVES together.
  16. Locate and cement CHIMNEY to ROOF.
  17. Cement CHIMNEY CAP to CHIMNEY.
  18. Locate and cement PACKING CASES and TRUNKS to WALK in front of FREIGHT DOOR of STATIONS. Set aside to dry.

B. Assembly Of Waiting Platform

  1. Locate and cement ROOF SUPPORT POSTS to PLATFORM FLOOR.
  2. Cement FRONT and REAR ROOF SECTIONS to ROOF SUPPORT POSTS.
  3. Cement SIDE ROOF SECTIONS to FRONT and REAR ROOF SECTIONS.
  4. Locate and cement (2) BENCHES to center of PLATFORM FLOOR.
  5. Cement RAIN GUTTERS to underside of ROOF.
  6. Locate and cement DOWN SPOUTS to ROOF SUPPORT POSTS and RAIN GUTTERS.
  7. Cement (2) LIGHT FIXTURES to inside of ROOF SUPPORT POSTS.
  8. Cement WEIGHT SCALE POST and PLATFORM SECTIONS together.
  9. Locate and cement WEIGHT SCALE to one end of PLATFORM FLOOR.
  10. Locate and cement SUITCASE and HAT BOX to PLATFORM FLOOR.