A. Assembly Of Station Building
- Locate and cement, from the inside, WINDOWS and DOORS to openings in WALLS.
- Cement END WALLS to FRONT WALL. NOTE: END WALLS are interchangeable so that END WALL with FREIGHT DOOR may be placed either on the LEFT or the RIGHT.
- Cement REAR WALL to END WALLS.
- Locate and cement WALL ASSEMBLY to BASE WALK.
- Locate and cement FRONT ROOF and REAR ROOF to WALLS.
- Locate and cement FRONT GABLE ROOF HALVES to FRONT GABLE.
- Locate and cement REAR GABLE ROOF HALVES to REAR GABLES.
- Locate and cement ROOF EXTENSION SUPPORTS to CORNERS of WALLS.
- Locate and cement FRONT and REAR ROOF EXTENSIONS to FRONT and REAR WALLS.
- Cement SIDE ROOF EXTENSIONS to SIDE WALLS.
- Locate and cement RAIN GUTTERS to ROOF EXTENSIONS.
- Locate and cement (2) DOWN SPOUTS to GUTTERS and WALLS.
- Cement (2) LIGHT FIXTURES at TOP of DOORWAYS.
- Cement (2) STATION SIGN BOARDS to underside of SIDE ROOF EXTENSIONS.
- Cement CHIMNEY HALVES together.
- Locate and cement CHIMNEY to ROOF.
- Cement CHIMNEY CAP to CHIMNEY.
- Locate and cement PACKING CASES and TRUNKS to WALK in front of FREIGHT DOOR of STATIONS. Set aside to dry.
B. Assembly Of Waiting Platform
- Locate and cement ROOF SUPPORT POSTS to PLATFORM FLOOR.
- Cement FRONT and REAR ROOF SECTIONS to ROOF SUPPORT POSTS.
- Cement SIDE ROOF SECTIONS to FRONT and REAR ROOF SECTIONS.
- Locate and cement (2) BENCHES to center of PLATFORM FLOOR.
- Cement RAIN GUTTERS to underside of ROOF.
- Locate and cement DOWN SPOUTS to ROOF SUPPORT POSTS and RAIN GUTTERS.
- Cement (2) LIGHT FIXTURES to inside of ROOF SUPPORT POSTS.
- Cement WEIGHT SCALE POST and PLATFORM SECTIONS together.
- Locate and cement WEIGHT SCALE to one end of PLATFORM FLOOR.
- Locate and cement SUITCASE and HAT BOX to PLATFORM FLOOR.
