Posts Tagged ‘house’
Saturday, May 1st, 2010
- Locate and cement, from the inside, FRONT and REAR WINDOWS to FRONT and REAR WALLS.
- Cement PATIO FLOOR to BOTTOM of RIGHT PARTIAL WALL. Set aside to dry.
- Cement FRONT and REAR WALLS to LEFT SIDE WALL.
- Cement RIGHT PARTIAL WALL and PATIO FLOOR to REAR WALL and bottom of FRONT WALL. Set aside to dry.
- Cement SIDES and FRONT END of CHIMNEY together.
- Cement CHIMNEY BACK END TOP SECTION to CHIMNEY. Set aside to dry.
- Cement CHIMNEY CAP HALVES together.
- Cement CHIMNEY TOP to CHIMNEY CAP.
- Cement CHIMNEY CAP to CHIMNEY.
- Cement FURNACE ROOM WALL to LEFT SIDE of FURNACE ROOM DOOR.
- Locate and cement CHIMNEY to PATIO FLOOR and to edge of RIGHT PARTIAL WALL.
- Locate and cement FURNACE ROOM DOOR and WALL ASSEMBLY to SIDE of CHIMNEY and RIGHT PARTIAL WALL.
- Cement, from the inside, GLASS SIDE DOOR to CHIMNEY and END of FRONT WALL.
- Cement FRONT ROOF to FRONT and SIDE WALLS.
- Cement FRONT SKYLIGHT WINDOW to FRONT ROOF and ENDS of SIDE WALLS.
- Cement REAR ROOF to REAR and SIDE WALLS and FRONT SKYLIGHT WINDOW.
- Cement PATIO ROOF to TOP of FURNACE ROOM WALL and DOOR.
- Cement PATIO ROOF SUPPORT COLUMN to PATIO ROOF and PATIO FLOOR.
- Locate and cement (4) ROOF VENTILATORS to REAR ROOF.
- Cement, from the inside, SMALL DOOR WINDOWS to DOUBLE DOORS in LEFT SIDE WALL.
- Cement (2) DOOR HANDLES to DOUBLE DOORS in LEFT SIDE WALL.
- Cement DOOR HANDLE to GLASS DOOR in RIGHT SIDE WALL.
- Cement FLOOD LIGHT to SIDE of CHIMNEY.
- Cement STRAIGHT GLOBE LIGHT FIXTURE underneath PATIO ROOF.
- Cement ANGLE GLOBE LIGHT FIXTURE over TOP of LEFT SIDE WALL.
- Cement BELL to TOP of LEFT SIDE WALL.
- Cement SIAMESE SPRINKLER PIPE to LEFT SIDE WALL at front corner. Set aside to dry.
Assembly Of Playground Equipment
- Cement FLAG POLE to FLAG POLE BASE.
- Cement SIDES and TOP of MONKEY BARS together.
- Cement SLIDE CHUTE to SLIDE LADDER.
- Cement SWING SIDES and SWING BAR together.
- Cement SEESAW BOARD to BASE.
- Cement MERRY GO ROUND BASE and PUSH BAR to PEDESTAL.
- Attach FLAG to FLAG POLE.
Tags: 654, assembly, aurora, HO, house, instructions, merry go round, monkey bars, playground, school, seesaw, slide, swing
Posted in Aurora Model Motoring HO Slot Car Racing | No Comments »
Friday, April 30th, 2010
- Locate and cement DOOR HINGES to GARAGE DOOR.
- Locate and cement HINGE SOCKETS to sides at GARAGE DOOR OPENING.
- Allow cemented DOOR HINGES and HINGE SOCKETS to dry for about five (5) minutes and then assemble DOOR to OPENING by inserting HINGES into HINGE SOCKETS.
- Locate and cement FRONT DOOR to OUTSIDE of FRONT WALL of HOUSE.
- Locate and cement WINDOW WALL to FRONT WALL from the inside.
- Similarly, locate and cement, from the inside PICTURE WINDOW, LATTICE WINDOW and SMALL WINDOWS to FRONT WALL.
- Locate and cement GARAGE DOOR and WALL ASSEMBLE to RIGHT SIDE of FRONT WALL.
- Locate and cement LEFT END WALL to LEFT SIDE of FRONT WALL.
- Locate and cement GARAGE END WALL to FRONT and REAR WALL.
- Locate and cement REAR WALL to LEFT END WALL and to GARAGE INSIDE WALL.
- Locate and cement GARAGE REAR WALL to GARAGE INSIDE WALL and to GARAGE DOOR OPENING.
- Locate and cement ROOF (3) PARTS to HOUSE.
- Locate and cement GABLE HALVES together.
- Locate and cement TRIANGULAR PANEL to FRONT of GABLE.
- Locate and cement GABLE ASSEMBLY to ROOF.
- Locate and cement CHIMNEY HALVES together and cement to ROOF.
- Cement CHIMNEY CAP to CHIMNEY.
- Cement CUPOLA HALVES together and cement to GARAGE ROOF.
- Cement CUPOLA ROOF to CUPOLA.
- Cement (16) SHUTTERS to SIDES of WINDOWS.
- Locate and cement (6) WINDOW BOXES underneath WINDOWS of LEFT END WALL and FRONT and REAR GARAGE WALLS.
- Locate and cement RAIN GUTTERS to underside of ROOF OVERHANG.
- Locate and cement DOWN SPOUTS to GUTTERS and WALLS.
- Cement WEATHER VANE to CUPOLA ROOF.
- Cement TV ANTENNA to POLE and cement to side of CHIMNEY.
Tags: 653, asembly, aurora, chimney, cupola, HO, house, instructions, ranch, TV antenna, weather vane
Posted in Aurora Model Motoring HO Slot Car Racing | No Comments »
Thursday, April 29th, 2010
- Locate and cement DOOR HINGES to GARAGE DOOR.
- Locate and cement HINGE SOCKETS to sides at GARAGE DOOR OPENING.
- Allow cemented DOOR HINGES and HINGE SOCKETS to dry for about five (5) minutes and then assemble DOOR to OPENING by inserting HINGES into HINGE SOCKETS.
- Locate and cement LEFT END WALL to LEFT SIDE of LOWER FRONT WALL.
- Locate and cement, from the inside, (2) PICTURE WINDOWS to FRONT WALL.
- Locate and cement LEFT END WALL to LEFT SIDE of LOWER FRONT WALL.
- Locate and cement GARAGE INSIDE WALL to RIB on inside of FRONT WALL between WINDOW and GARAGE DOOR.
- Locate and cement REAR WALL to LEFT END WALL and to GARAGE INSIDE WALL.
- Locate and cement GARAGE END WALL to FRONT and REAR WALL.
- Locate and cement UPPER FRONT WALL to SIDE WALLS.
- Locate and cement SUN DECK over GARAGE END of HOUSE.
- Locate and cement CHIMNEY to LEFT END WALL.
- Locate and cement CHIMNEY SMALL SECTION to UPPER PART of CHIMNEY.
- Locate and cement CHIMNEY CAP to CHIMNEY.
- Locate and cement ROOF to HOUSE.
- Locate and cement SUN DECK RAILING (3 Sections) to SUN DECK.
- Locate and cement (2) TRELLISES to GARAGE END WALL.
- Locate and cement (12) WIDE SHUTTERS to sides of FRONT and REAR SECOND STORY WINDOWS.
- Locate and cement (10) NARROW SHUTTERS to sides of WINDOWS in END WALLS.
- Locate and cement (2) DOOR CANOPIES over BACK DOORS.
- Locate and cement (2) FRONT DOOR LIGHTS alongside FRONT DOOR.
- Locate and cement RAIN GUTTERS to underside of ROOF OVERHANG.
- Locate and cement DOWN SPOUTS to GUTTERS and WALLS.
- Locate and cement FRONT DOOR STEP to FRONT WALL.
- Locate and cement BACK DOOR STEP and PATIO to BACK WALL.
Tags: 652, assembly, aurora, chimney, colonial, garage, HO, house, instructions, shutters, sun deck, trellises
Posted in Aurora Model Motoring HO Slot Car Racing | No Comments »