Posts Tagged ‘house’

Aurora HO Model 654-129 School House Assembly Instructions

Saturday, May 1st, 2010
  1. Locate and cement, from the inside, FRONT and REAR WINDOWS to FRONT and REAR WALLS.
  2. Cement PATIO FLOOR to BOTTOM of RIGHT PARTIAL WALL. Set aside to dry.
  3. Cement FRONT and REAR WALLS to LEFT SIDE WALL.
  4. Cement RIGHT PARTIAL WALL and PATIO FLOOR to REAR WALL and bottom of FRONT WALL. Set aside to dry.
  5. Cement SIDES and FRONT END of CHIMNEY together.
  6. Cement CHIMNEY BACK END TOP SECTION to CHIMNEY. Set aside to dry.
  7. Cement CHIMNEY CAP HALVES together.
  8. Cement CHIMNEY TOP to CHIMNEY CAP.
  9. Cement CHIMNEY CAP to CHIMNEY.
  10. Cement FURNACE ROOM WALL to LEFT SIDE of FURNACE ROOM DOOR.
  11. Locate and cement CHIMNEY to PATIO FLOOR and to edge of RIGHT PARTIAL WALL.
  12. Locate and cement FURNACE ROOM DOOR and WALL ASSEMBLY to SIDE of CHIMNEY and RIGHT PARTIAL WALL.
  13. Cement, from the inside, GLASS SIDE DOOR to CHIMNEY and END of FRONT WALL.
  14. Cement FRONT ROOF to FRONT and SIDE WALLS.
  15. Cement FRONT SKYLIGHT WINDOW to FRONT ROOF and ENDS of SIDE WALLS.
  16. Cement REAR ROOF to REAR and SIDE WALLS and FRONT SKYLIGHT WINDOW.
  17. Cement PATIO ROOF to TOP of FURNACE ROOM WALL and DOOR.
  18. Cement PATIO ROOF SUPPORT COLUMN to PATIO ROOF and PATIO FLOOR.
  19. Locate and cement (4) ROOF VENTILATORS to REAR ROOF.
  20. Cement, from the inside, SMALL DOOR WINDOWS to DOUBLE DOORS in LEFT SIDE WALL.
  21. Cement (2) DOOR HANDLES to DOUBLE DOORS in LEFT SIDE WALL.
  22. Cement DOOR HANDLE to GLASS DOOR in RIGHT SIDE WALL.
  23. Cement FLOOD LIGHT to SIDE of CHIMNEY.
  24. Cement STRAIGHT GLOBE LIGHT FIXTURE underneath PATIO ROOF.
  25. Cement ANGLE GLOBE LIGHT FIXTURE over TOP of LEFT SIDE WALL.
  26. Cement BELL to TOP of LEFT SIDE WALL.
  27. Cement SIAMESE SPRINKLER PIPE to LEFT SIDE WALL at front corner. Set aside to dry.

Assembly Of Playground Equipment

  1. Cement FLAG POLE to FLAG POLE BASE.
  2. Cement SIDES and TOP of MONKEY BARS together.
  3. Cement SLIDE CHUTE to SLIDE LADDER.
  4. Cement SWING SIDES and SWING BAR together.
  5. Cement SEESAW BOARD to BASE.
  6. Cement MERRY GO ROUND BASE and PUSH BAR to PEDESTAL.
  7. Attach FLAG to FLAG POLE.

Aurora HO Model 653-98 Ranch House Assembly Instructions

Friday, April 30th, 2010
  1. Locate and cement DOOR HINGES to GARAGE DOOR.
  2. Locate and cement HINGE SOCKETS to sides at GARAGE DOOR OPENING.
  3. Allow cemented DOOR HINGES and HINGE SOCKETS to dry for about five (5) minutes and then assemble DOOR to OPENING by inserting HINGES into HINGE SOCKETS.
  4. Locate and cement FRONT DOOR to OUTSIDE of FRONT WALL of HOUSE.
  5. Locate and cement WINDOW WALL to FRONT WALL from the inside.
  6. Similarly, locate and cement, from the inside PICTURE WINDOW, LATTICE WINDOW and SMALL WINDOWS to FRONT WALL.
  7. Locate and cement GARAGE DOOR and WALL ASSEMBLE to RIGHT SIDE of FRONT WALL.
  8. Locate and cement LEFT END WALL to LEFT SIDE of FRONT WALL.
  9. Locate and cement GARAGE END WALL to FRONT and REAR WALL.
  10. Locate and cement REAR WALL to LEFT END WALL and to GARAGE INSIDE WALL.
  11. Locate and cement GARAGE REAR WALL to GARAGE INSIDE WALL and to GARAGE DOOR OPENING.
  12. Locate and cement ROOF (3) PARTS to HOUSE.
  13. Locate and cement GABLE HALVES together.
  14. Locate and cement TRIANGULAR PANEL to FRONT of GABLE.
  15. Locate and cement GABLE ASSEMBLY to ROOF.
  16. Locate and cement CHIMNEY HALVES together and cement to ROOF.
  17. Cement CHIMNEY CAP to CHIMNEY.
  18. Cement CUPOLA HALVES together and cement to GARAGE ROOF.
  19. Cement CUPOLA ROOF to CUPOLA.
  20. Cement (16) SHUTTERS to SIDES of WINDOWS.
  21. Locate and cement (6) WINDOW BOXES underneath WINDOWS of LEFT END WALL and FRONT and REAR GARAGE WALLS.
  22. Locate and cement RAIN GUTTERS to underside of ROOF OVERHANG.
  23. Locate and cement DOWN SPOUTS to GUTTERS and WALLS.
  24. Cement WEATHER VANE to CUPOLA ROOF.
  25. Cement TV ANTENNA to POLE and cement to side of CHIMNEY.

Aurora HO Model 652-98 Colonial House Assembly Instructions

Thursday, April 29th, 2010
  1. Locate and cement DOOR HINGES to GARAGE DOOR.
  2. Locate and cement HINGE SOCKETS to sides at GARAGE DOOR OPENING.
  3. Allow cemented DOOR HINGES and HINGE SOCKETS to dry for about five (5) minutes and then assemble DOOR to OPENING by inserting HINGES into HINGE SOCKETS.
  4. Locate and cement LEFT END WALL to LEFT SIDE of LOWER FRONT WALL.
  5. Locate and cement, from the inside, (2) PICTURE WINDOWS to FRONT WALL.
  6. Locate and cement LEFT END WALL to LEFT SIDE of LOWER FRONT WALL.
  7. Locate and cement GARAGE INSIDE WALL to RIB on inside of FRONT WALL between WINDOW and GARAGE DOOR.
  8. Locate and cement REAR WALL to LEFT END WALL and to GARAGE INSIDE WALL.
  9. Locate and cement GARAGE END WALL to FRONT and REAR WALL.
  10. Locate and cement UPPER FRONT WALL to SIDE WALLS.
  11. Locate and cement SUN DECK over GARAGE END of HOUSE.
  12. Locate and cement CHIMNEY to LEFT END WALL.
  13. Locate and cement CHIMNEY SMALL SECTION to UPPER PART of CHIMNEY.
  14. Locate and cement CHIMNEY CAP to CHIMNEY.
  15. Locate and cement ROOF to HOUSE.
  16. Locate and cement SUN DECK RAILING (3 Sections) to SUN DECK.
  17. Locate and cement (2) TRELLISES to GARAGE END WALL.
  18. Locate and cement (12) WIDE SHUTTERS to sides of FRONT and REAR SECOND STORY WINDOWS.
  19. Locate and cement (10) NARROW SHUTTERS to sides of WINDOWS in END WALLS.
  20. Locate and cement (2) DOOR CANOPIES over BACK DOORS.
  21. Locate and cement (2) FRONT DOOR LIGHTS alongside FRONT DOOR.
  22. Locate and cement RAIN GUTTERS to underside of ROOF OVERHANG.
  23. Locate and cement DOWN SPOUTS to GUTTERS and WALLS.
  24. Locate and cement FRONT DOOR STEP to FRONT WALL.
  25. Locate and cement BACK DOOR STEP and PATIO to BACK WALL.