Posts Tagged ‘gas’

2608 Plasticville HO Slot Car Racing Track Layout Gas Station Structure

Saturday, May 22nd, 2010

The 2608-100 Gas Station has a total number of 20 pieces that make up this easy to assemble model kit.

2608 Plasticville HO Slot Car Racing Track Layout Gas Station Structure

2608 Plasticville HO Slot Car Racing Track Layout Gas Station Structure

Aurora HO Model 1453-198 Dual Pit Stop Assembly Instructions

Sunday, May 9th, 2010
  1. Cement DRUM to HAND TRUCK.
  2. Cement BUMPER JACK HANDLE to JACK BASE.
  3. Cement MOTOR into RACK on DOLLY.
  4. Cement SHELVES to TIRE RACK ENDS.
  5. Cement REAR WALL (#16) to FLOOR (#19).
  6. Cement RIGHT SIDEWALL (#29) and LEFT SIDEWALL (#30) to REAR WALL and FLOOR.
  7. Cement (2) ASSEMBLED TIRE RACKS to TRACKS on FLOOR.
  8. Cement OIL DRUM (with PUMP) (#23) to FLOOR and AIR COMPRESSOR (#9) to REAR WALL.
  9. Cement FIRE EXTINGUISHER (#28) to LEFT SIDE of CENTER WALL, then cement CENTER WALL to REAR WALL and FLOOR.
  10. Cement CHAIN HOISTS (#17) and (#18) into position on REAR WALL.
  11. Cement ROOF SUPPORT (#4) to CENTER WALL and FLOOR.
  12. Cement BEAM (#5) to SIDE WALLS and ROOF SUPPORT.
  13. Cement ROOF (#1) to REAR WALL, SIDE WALLS and LINTEL.
  14. Cut out sections of DECALS and apply to ROOF SIGNS. Read directions on back of DECALS before applying.
  15. Cement ROOF SIGNS (#2) and (#3) to ROOF.

Aurora HO Model 658-149 Gas Station Assembly Instructions

Wednesday, May 5th, 2010
  1. Read DIRECTIONS on back of DECALS and apply as follows:
    1. Tires, Tools and Accessories Decal to inside of Rear Wall of SERVICE STATION BUILDING.
    2. MODEL MOTORING SERVICE STATION” DECAL to HIGHWAY SIGNBOARD.
    3. AURORA SERVICE STATION” DECALS to SIGN POSTS.
    4. MODEL MOTORING SERVICE CENTER” DECAL to ROOF SIGN. Set aside to dry.
  2. Cement clear plastic DOOR HANGERS to rear of each LARGE DOOR. Set aside to dry.
  3. Cement DOOR HANGER BRACES to inside of FRONT WALL PANEL.
  4. Cement SMALL DOOR in position to FRONT WALL PANEL. Set FRONT WALL PANEL aside to dry.
  5. Cement HYDRAULIC JACK HANDLE to JACK BASE. Set aside to dry.
  6. Cement GAS SIGN LEGS to GAS SIGN. Set aside to dry.
  7. Cement GASOLINE PUMP HALVES together, #1 to #1, #2 to #2, etc, with GAUGE PANEL between HALVES. Cement PUMP HOSE NOZZLE to PUMPS. Set aside to dry.
  8. Cement ISLAND SIGN to ISLAND together with ISLAND SIGN BASE HALVES.
  9. Cement OIL SHELF PANELS to SIGN BASE.
  10. Cement GASOLINE PUMPS to ISLAND.
  11. Cement SHORT and INTERMEDIATE SPOTLIGHTS to ISLAND SIGN and set aside to dry.
  12. Cement TIRE RACK SHELVES between RACK ENDS. Cement TIRES on RACK and set aside to dry.
  13. Cement FRONT and BACK of AIR PUMP to AIR PUMP BASE with AIR GAUGE cemented to TOP. Set aside to dry.
  14. Cement INDICATOR to FRONT PANEL of “COKE” MACHINE.
  15. Cement FRONT and REAR PANELS of “COKE” MACHINE together and cement TOP to MACHINE.
  16. Cement “COKE” MACHINE to MACHINE BASE.
  17. Cement HIGHWAY SIGN to SIGN BASE and 4 LONG SPOTLIGHTS to top of HIGHWAY SIGN. Set aside to dry.
  18. Cement CASH REGISTER to COUNTER TOP and TOP to COUNTER BASE. Set aside to dry.
  19. Cement TELEPHONE to corner of BOOTH BASE as shown. Cement BOOTH UPPER HALF to BASE. Cement BOOTH DOOR into PLACE. Set aside to dry.
  20. Cement PUSH BAR to SMALL DOOR in FRONT WALL.
  21. Snap clear plastic DOOR HANGERS into HOLES in ends of DOOR HANGER BRACES on FRONT WALL PANEL.
  22. Cement 2 END PANELS and BACK WALL and FRONT WALL PANELS together.
  23. Cement WALL PANELS to STATION FLOOR. Allow to dry.
  24. Cement COUNTER to STATION FLOOR.
  25. Cement FRONT and SIDE GLASS STORE PANELS to FRONT WALL and RIGHT END WALL PANELS.
  26. Cement MARQUEE into position. Be sure GLASS PANELS enter groove in bottom of MARQUEE.
  27. Cement STATION ROOF to SIDE WALL PANELS. Set aside to dry.
  28. Cement ROOF SIGN to STATION ROOF.