Posts Tagged ‘air’

Aurora HO Model 1453-198 Dual Pit Stop Assembly Instructions

Sunday, May 9th, 2010
  1. Cement DRUM to HAND TRUCK.
  2. Cement BUMPER JACK HANDLE to JACK BASE.
  3. Cement MOTOR into RACK on DOLLY.
  4. Cement SHELVES to TIRE RACK ENDS.
  5. Cement REAR WALL (#16) to FLOOR (#19).
  6. Cement RIGHT SIDEWALL (#29) and LEFT SIDEWALL (#30) to REAR WALL and FLOOR.
  7. Cement (2) ASSEMBLED TIRE RACKS to TRACKS on FLOOR.
  8. Cement OIL DRUM (with PUMP) (#23) to FLOOR and AIR COMPRESSOR (#9) to REAR WALL.
  9. Cement FIRE EXTINGUISHER (#28) to LEFT SIDE of CENTER WALL, then cement CENTER WALL to REAR WALL and FLOOR.
  10. Cement CHAIN HOISTS (#17) and (#18) into position on REAR WALL.
  11. Cement ROOF SUPPORT (#4) to CENTER WALL and FLOOR.
  12. Cement BEAM (#5) to SIDE WALLS and ROOF SUPPORT.
  13. Cement ROOF (#1) to REAR WALL, SIDE WALLS and LINTEL.
  14. Cut out sections of DECALS and apply to ROOF SIGNS. Read directions on back of DECALS before applying.
  15. Cement ROOF SIGNS (#2) and (#3) to ROOF.