- Cement (2) LONG VENETIAN BLINDS to FRONT WALL PANEL.
- Cement (2) SHORT VENETIAN BLINDS, one to each of left and right SIDE WALL PANELS.
- Cement FRONT WALL PANEL to ROOF.
- Cement left and right SIDE WALL PANELS to ROOF and FRONT WALL PANEL.
- Cement REAR WALL PANEL to ROOF and SIDE WALL PANELS.
- Cement FRONT STONE PANEL to bottom of FRONT WALL PANEL.
- Cement REAR STONE PANEL to bottom of REAR WALL PANEL.
- Cement left and right SIDE STONE PANELS to bottom of SIDE WALL PANELS.
- Cement FRONT STAIRWAY to FRONT WALL.
- Cement STONE STAIRWAY FRONT to FRONT STAIRWAY.
- Cement CANOPY over FRONT DOORWAY.
- Cement (3) ROOF VENTILATORS to ROOF.
- Cement KITCHEN VENTILATOR to REAR WALL.
- Cement (2) DOWN SPOUTS to REAR WALL.
- Cement (3) SIGNS to ROOF.
- Cement (4) FLOODLIGHTS to SIDE WALLS.
Tags: 657, assembly, aurora, blinds, diner, HO, instructions, joes, kitchen, venetian, ventilator